Hyper Open Edge Cloud

[FINISHED] Maintenance: November 11th, 2026: Upgrade for Rapid Space ERP5

Rapid.Space Maintainance. Read the article for real time information.
  • Last Update:2026-11-12
  • Version:001
  • Language:en



2026-11-11 23:30 UTC (01:30+1 CEST, 20:30 BRT): Upgrade is finished

I delayed putting the site back online a bit longer then the expected to ensure everything was fine, and to speed up background (activites) processing.

All services are restored back to normal.


2026-11-11 22:00 UTC (00:00+1 CEST, 19:00 BRT): Database (fulltext) was recovered

The gronga was recovered (no data lost), upgrade continues.


2026-11-11 18:30 UTC (20:30 CEST, 15:30 BRT): Database problem

The gronga (fulltext) crashed after the upgrade started. We are repairing it, might lead to a larger downtime. We are working to solve the problem. 

2026-11-11 17:40 UTC (19:40 CEST, 14:40 BRT): Upgrade started

The system is under upgrade, the site will be offline soon.

2026-11-11 17:30 UTC (19:30 CEST, 14:30 BRT): Upgrade of Rapid Space master (a.k.a SlapOS Master) to the newest version

We are going to upgrade the Rapid Space master (a.k.a SlapOS Master) to latest code base. It aims to include a performance boost on security calculation and some minor bug fixes. 

The operation will lead to 30min to 50min of downtime. Do a large amount of objects to update, we expect that load be high during about 2hrs after the services be restored.

The affected sites/services are:

The following sites WON'T be affected:

During the downtime, servers using the API (command line and computer partitions) may fail to report or request services. They will resume normal operation automatically once the upgrade is finished.

An update will be posted here when the migration is started and done.